What is included
A transformer or ring main unit that has been delivered but not properly installed is a liability sitting on a plinth. Cable termination, earthing and testing are where installations either become safe and maintainable or become a problem that surfaces at the worst possible moment.
We install and commission the equipment we supply. That includes setting the unit, terminating cables, earthing, testing and handing over with the client present. Because we supplied the unit, there is no argument about whether a fault is a supply problem or an installation problem. It is our problem either way.
We have completed transformer and ring main unit supply and installation as a single scope, and separate ring main unit installations including cable termination and testing. For most clients a single scope is simpler, cheaper and considerably easier to hold someone accountable for.